David Liberman

Software Engineer

Software Engineer at Snap Inc.

2019Los Angeles, CA, US0 features3 connections

Claim profile: David Liberman

Verify your identity for v2 profile claiming so you can add unpatented launches and vouch for teammates.

Suggest a correction for David Liberman

Flag a misclassified patent, missing collaborator, or public link (press, OSS, talk) that clarifies what was built.

Experience & Features Shipped

S

Snap Inc.

Software Engineer · 2019

1 feature
  • Core Platform & Infrastructure

    Low-level networking, video/image codecs, compression, distributed storage, CDN routing, Android rewrite/startup performance, ML serving infra, and generic mobile OS optimizations.

    2019

Collaborator Network

People who frequently built and filed patents with David Liberman. Click anyone in the network to see what they shipped together and which teammates overlap.

3 collaborators
1×Denis Ovod1×IrinaKotelnikova1×Johan LindellDLDavid Liberman
Software Eng
Number = shared patents · Dashed = teammates who also worked together
DO

Denis Ovod

Software Eng · 1 patent together (2019)

Mutual Teammates (2)

Frequent Collaborators (3)

  • Profile
  • Profile
  • Profile
View collaborator details as table (3 people)
Frequent collaborators who co-invented with David Liberman
CollaboratorRoleShared PatentsYearsShared Features
Denis OvodSoftware Eng12019—
Irina KotelnikovaSoftware Eng12019—
Johan LindellSoftware Eng12019—

Go Deeper

Activity timeline by year

Activity Over Time

David Liberman's active years and patent cadence across public filings.

Patents by Year (2019–2019)

  1. 1
Underlying public patents (1)
  1. CONTEXT-AWARE JOB PRIORITIZATION

    The application changes the order of pending work when its operating context changes. Priority categories and job tags determine which task runs next.

Role verification & public sourcesInferred · Patents & Team Graph

In 2019, David Liberman co-invented software that reprioritizes pending application tasks as operating conditions change. Priority categories and job tags determine which work runs next.

Role signal: The G06F scheduling and resource-allocation CPCs indicate low-level software infrastructure rather than consumer product management. The supplied record contains only one filing and one squad, with no verified title or evidence supporting executive or staff seniority.